SunGoldPower Off-Grid Solar System — 6.5–8kW / 10.24–20.48kWh
Complete SunGoldPower Off-Grid Solar Systems
Build a serious 48V off-grid power system with a matched SunGoldPower package supplied through Elevation UpScales, Inc., an authorized SunGoldPower dealer. Choose from 6.5kW or 8kW split-phase inverter capacity, 10.24kWh or 20.48kWh of LiFePO4 storage, and a complete 450W bifacial N-type solar array.
Designed for: cabins, tiny homes, workshops, remote properties, larger RV/off-grid applications, and backup-power projects that need both 120V and 240V output.
SGR-6510E — 6.5kW / 10.24kWh / 3.6kW PV
- 1 × 6500W 48VDC split-phase inverter, 120/240VAC output
- 8 × 450W bifacial N-type monocrystalline solar panels — 3.6kW array
- 2 × 100Ah 51.2V LiFePO4 batteries — 10.24kWh total storage
- 1 × 50-ft solar extension cable set
- 8 × mounting Z-bracket sets
- 1 × 200A DC breaker
- 1 × 25A PV breaker
- 2 × 2/0 AWG cable sets for breaker/battery/inverter connections
SGR-8K10E — 8kW / 10.24kWh / 3.6kW PV
- 1 × 8000W 48VDC split-phase inverter, 120/240VAC output
- 8 × 450W bifacial N-type monocrystalline solar panels — 3.6kW array
- 2 × 100Ah 51.2V LiFePO4 batteries — 10.24kWh total storage
- 1 × 50-ft solar extension cable set
- 8 × mounting Z-bracket sets
- 1 × 200A DC breaker
- 1 × 25A PV breaker
- 2 × 2/0 AWG cable sets for breaker/battery/inverter connections
SGM-8K20 — 8kW / 20.48kWh / 5.4kW PV
- 1 × 8000W 48VDC split-phase inverter, 120/240VAC output
- 12 × 450W bifacial N-type monocrystalline solar panels — 5.4kW array
- 4 × SG48100P 100Ah 51.2V LiFePO4 batteries — 20.48kWh total storage
- 2 × 50-ft solar extension cable sets
- 12 × mounting Z-bracket sets
- 1 × 200A DC breaker
- 2 × 25A PV breakers
- 2 × 2/0 AWG cable sets for breaker/battery/inverter connections
Why Buy Through Elevation UpScales
- Authorized SunGoldPower dealer
- Exact-model support before purchase
- System matching for off-grid, backup and property-power applications
- Destination-aware fulfillment and freight coordination
- Support coordinating the complete equipment package rather than piecing a system together one component at a time
Fulfillment: Supplier fulfilled from SunGoldPower's U.S. operation. SunGoldPower's current dealer sheet lists a 3-day handling target; final transit timing depends on destination and shipment configuration.
Installation note: This is an equipment package. Electrical design, permitting, code compliance and final installation requirements vary by site and jurisdiction. Use a qualified installer/electrician where required.